Anderlingen-Ohrel, Germany

Biogas plant Anderlingen Ohrel Germany

Facts & Figures

Genset/engine (R 029): 1 x TCG 2016 V08C in container
1 x TCG 2016B
Segment/gas type: Biogas
Customer: Anderlingen, Germany
Total output: 400 kWel + 716kWel
Commissioning: 2009 + 2007

A container-hosted TCG 2016 V08C generates 3,200 MWh of power and 2,552 MWh of heat a year, which are used for the biogas plant.

Additionally, a previously installed TCG 2016 V16B, which runs on gas from the same plant, supplies a local heat network. The integrated MWM biogas processing secures the technology bonus according to the German Renewable Energies Act (EEG).

Contact

MWM Representation in Moscow
Sales & Service
Caterpillar Energy Solutions GmbH
Bldg. 1, 5/2, 1st Kazachiy per.
119017 Moscow
Russian Federation

T: +7 495 234 49 41
E: A00BAaCA9-CdAd1CeB2A5eB1Ad2BbC6BA0abA88A6cA63CeBbAdA066B1C6B8
W: www.mwm.com.ru