Rahim Steel, Bangladesh

Rahim Steel, Bangladesh

Facts & Figures

Genset/engine (R 055): 8 x TCG 2032 V16
Segment/gas type: Natural gas
Customer: Rahim Steel, Bangladesh
Total output: 31.2 MWel
Commissioning: 2008

Eight gensets supply a steel factory with power. Due to the plant's special load response requirements, the plant was equipped with an exhaust gas waste gate and a by-pass in order to enable customer-specific load response. This was one of the first plants that used a large-scale solution of this type.

Contact

MWM Representation in Moscow
Sales & Service
Caterpillar Energy Solutions GmbH
Bldg. 1, 5/2, 1st Kazachiy per.
119017 Moscow
Russian Federation

T: +7 495 234 49 41
E: A00BAaCB2A9DA9-AcbCaB3A5fAcfB3B7D7B1Ad9A59A68A64DfAd9B1A62C7Ad6
W: www.mwm.com.ru