Gas engine TCG 2032
3,000 - 4,500 kWel
High reliability. Low operating costs. Mainly used in large IPP projects, up to 100 MWel.
MWM TCG 2032 V12, V16 Gas Engine – High reliability. Low operating costs.
Compelling arguments – Features at a glance
- Output range from 3,000 to 4,500 kWel
- Runs on all gas types: natural gas, landfill gas, sewage gas, mine gas, coke oven gas, biogas(1)
- Mainly used in large IPP projects with up to 100,000 kWel
- The series features superb reliability and low operating and maintenance costs.
- High reliability
- Low operating costs
- Also available with fast ramp-up option for the gas engine TCG 2032B V16
- More than 740 power generators with approximately 2,850,000 kWel already installed around the globe
The MWM gas engines of the TCG 2032 series are perfectly geared to the challenges of a dynamic market environment. In the power range of 3,000 - 4,500 kWel reliability, flexibility, efficiency and environmental compatibility are ensured along with low life-cycle costs. In this way, they meet the high requirements of a wide range of applications and are highly profitable.
TCG 2032B V16 gas engine with fast ramp-up option
TCG 2032B V16 gas engine with fast ramp-up option - 4.5MWel gas engine for a quick start
- The feature of a fast ramp-up start is becoming increasingly important due to growing intermittent renewable capacity such as wind and solar
- The MWM TCG 2032B(2) gas engine has a software option for a fast ramp-up start. This option allows to switch between normal and fast start requirement for each start request
- A fast start is a start in less than five minutes from start request to 100% load on the grid
(2) Available for all TCG 2032B V16 standard voltages 6000 V to 11 kV @50Hz, only for natural gas
High reliability. Low operating costs – Gas Engine TCG 2032
High Efficiency and Low Lubricant Consumption
- High fuel utilization and low operation costs thanks to optimized chamber spark plug
- Increased efficiency through new closed crankcase ventilation that enables utilization of the blow-by gas
- High availability through long maintenance intervals: first maintenance after 4,000 h, major overhaul after 80,000 h
- TCG 2032: With its lubricant consumption of only 0.2 g/kWh up to 30 percent lower lubricant consumption compared to competitor products thanks to optimized tappet sealing, coke stripping rings and ring packages
Soot-Free Combustion Increases Plant Profitability
- Open combustion chamber with chamber spark plug for soot-free combustion
- Extended maintenance intervals for the exhaust gas heat exchanger
- No pre-combustion chamber with time-consuming maintenance and risk of failure
- No additional gas supply with increased gas pressure required for pre-combustion chamber
Few Interruptions Due to Long Maintenance Intervals
- No more than two interruptions a year due to scheduled maintenance
- Longest interval until major overhaul compared to competitors
- Use of Xchange components enables time savings of up to 75 percent during the major overhaul, resulting in reduced costs
High Availability - Gas Engine TCG 2032
New Turbocharger Technology Increases Genset Availability
- Improved output under non-ISO conditions
- High output of 4,500 kWel possible through use of A140 high-pressure turbocharger
- Turbocharger achieves higher compression ratio and enables operation under full load with intake air of up to 45°C
- Exhaust gas waste gate enables constant performance with different intake air temperatures and setup altitudes
- Evening out of reserve boost pressure in relation to load results in higher efficiency and improved load response
Low Installation Costs - Gas Engine TCG 2032
Compact Engine Design for Easy Transport and Installation
- Extremely lean genset with compact dimensions, low noise emissions, and smooth running guarantees minimum installation costs
- Compared to competitors, the specific output/weight ratio is up to 40 percent better
- Lighter engine components eliminate need for strong crane
- Compared to competitors, TCG 2032 V16 is up to 30 percent shorter in length
- Low weight and compact dimensions enable easy transport even to remote destinations
Short Project Period - Gas Engine TCG 2032
Short Project Period Thanks to Compact Setup
- Pre-manufactured components directly from the manufacturer ensure quick and easy assembly on site
- Identical setup of the individual modules facilitates flexible adjustment of the plant output
- Modest need for space through compact design
- Plant planning and building from one source guarantees smooth, cost-efficient project rollout
Lower Service Costs - Gas Engine TCG 2032
Low Service Costs and a Lean Maintenance Concept
- Enhanced maintenance concept through easy access to the cylinder units
- Long service intervals and improved serviceability
- Low maintenance costs due to fewer engine parts, resulting in low maintenance overhead and spare parts requirement
- Lower maintenance overhead through open combustion chamber with pre-combustion chamber spark plug
CHP ROI Calculator
Calculate the profitability of MWM cogeneration power plants and gas engines.
Contact
MWM Representation in Moscow
Sales & Service
Caterpillar Energy Solutions GmbH
Bldg. 1, 5/2, 1st Kazachiy per.
119017 Moscow
Russian Federation
T: +7 495 234 49 41
E: A00BAaCA9-CbB5AccB5CA09fB6Ad9C9Ad2B9A5cCaA66AdA0a9B4C4B4Ac8B6
W: www.mwm.com.ru